Homestead Plans

Your land, drawn into a homestead.

A Homestead Plan is a drawn site plan and a written build sequence for one piece of land. Tell us about yours, and we make it for you: where everything goes, the order to build it in, and what it takes.

Tell us about your land See a sample plan

What a custom plan is

One plan, made for one piece of ground.

You tell us where the land is, what is on it now and what you want it to become. We draw the site plan to scale and write the build in order, from the first load of gravel to the root cellar, around your acreage, your county and your climate.

Raw land comes with a hundred decisions and no order to make them in. The plan puts them in order: the costly, permitted work first, the work a family can do themselves after, and room left on purpose for what comes later.

Sheet S-1 of the sample Homestead Plan: a five acre property drawn to scale, with the house, well, septic ground, driveway, kitchen garden, orchard, barn, paddocks, woodlot and creek, each numbered to a key.
The site plan from our sample: five acres in northwest Montana. See the whole sample.

What you receive

Seven parts, in one PDF you can print.

  1. 01

    The drawn site plan

    Your land to scale, north up: where the house, the well, the septic ground, the driveway, the garden, the animals and the power can go, and why each one sits where it sits.

  2. 02

    The smaller sheets

    Zones by how often you walk there, sun and wind at the house site, and the kitchen garden bed by bed.

  3. 03

    The build in phases, from raw land

    What gets built first and why, what to hire out, what a family can do with their own hands, and what needs a permit.

  4. 04

    Materials with quantities

    Gravel, fence, pipe, posts and lumber, each amount measured from the drawing.

  5. 05

    Cost ranges

    Published ranges, each one naming where it came from. Where a number cannot be checked, the plan says so and tells you to get a quote.

  6. 06

    The permits and rules for your county

    Septic, well, building, access and setbacks, with the office to call and the questions to ask.

  7. 07

    The first-year calendar

    Frost dates and a season-by-season list for the climate where your land is.

Read the sample, start to finishOpen the sample PDF

Three plans, three set prices

Pick the one that fits where you are.

No land yet

Starter Homestead Plan

$49

For a typical lot of 1, 5, 10 or 20 acres in the city or county you name: a drawn layout, the build in phases, materials, and the climate, frost dates and county rules for that place.

Drawn for a typical lot, not for your parcel.

Start a Starter plan

Your land, 20 acres or under

Custom Homestead Plan

$297

For land you own or are buying. Drawn for your real land: the site plan, the smaller sheets, the build in phases from raw land, materials with quantities, cost ranges, your county's permits and rules, and the first-year calendar.

Tell us about your land

Your land, over 20 acres

Custom Homestead Plan

$497

The same custom plan, for land of more than 20 acres: more to draw, more fence, more water line and more decisions about what to leave alone.

Tell us about your land

Each is one set price, paid in full when you order. The form works out which custom price applies from your acreage and shows it before you pay. Still looking for land, or not sure of the acreage? Send the form as a question and pay nothing.

How it works

Three steps.

1

Tell us about your land

Fill in the form on this page: where the land is, what is on it now and what you want it to become. You see your price before you pay, and you pay in full at checkout.

2

We make your plan

We read your answers, look up the climate records and the county rules for your place, and draw the plan around your land and your household. If we need to ask you something, we write to the email you gave. We check every plan ourselves before it goes out.

3

We email it to you

Your plan arrives by email as a PDF you can print. Every drawing in it stays sharp at any size, so you can zoom in on a corner or print a sheet large.

Plain words

What a Homestead Plan is, and what it is not

A Homestead Plan is a site plan and a build sequence to plan with. It is not a set of stamped construction drawings, it is not engineering and it is not a survey. It shows where things can go, in what order to build them and what they take.

The septic system is designed and permitted through your county. The well is sited by your driller. Property corners are found by a licensed surveyor. Costs are published ranges, not bids. Rules change, so the plan names each office and the questions to ask it. Terms.

Custom Homestead Plan

Tell us about your land.

For land you own or are buying. Fill in what you know and skip what you do not. $297 for 20 acres or under, $497 for land over 20 acres. No land yet? The Starter plan is below.

1. You
Only if you would like a call when we have a question.
2. The land
The address if it has one. If not, the county and state, the nearest town and road, or the area you are looking in.
A number, such as 5 or 12.5. Leave it empty if you do not know yet, and send the form as a question.
3. What is on it now (tick any that apply)
4. The lay of it
Flat or sloped and which way it faces, open or timbered, any creek, pond, spring, wet ground or ditch, and the road it fronts.
Deep cold, a short season, drought, wildfire, wind, flooding, heat.
5. What you want on it (tick any that apply)
6. Your household and your start
7. Anything else
A shared folder or album link, starting with https://. If you have none, leave it empty and we will ask if we need one.

Your price: $297 for 20 acres or under, $497 for land over 20 acres. Type your acreage above and this line shows which applies.

We save your answers first, then take you to checkout to pay in full. Holding a gift certificate? Enter your code first. A Homestead Plan is a site plan and a build sequence to plan with. It is not a set of stamped construction drawings, it is not engineering and it is not a survey.

Starter Homestead Plan, $49

No land yet? Start here.

Tell us where you want to be and the lot size you have in mind. We make a plan for a typical lot of that size in that area: a drawn layout, the build in phases, materials, and the climate, frost dates and county rules for the place you named.

It is drawn for a typical lot, not for your parcel. When you have real land, the Custom Homestead Plan is the one drawn for it.

1. You
2. Where, and how big

The lot size you have in mind

3. What you want on it (tick any that apply)

Your price: $49, paid in full at checkout. We save your answers first, then take you there.

A Homestead Plan is a site plan and a build sequence to plan with. It is not a set of stamped construction drawings, it is not engineering and it is not a survey.

Questions

Asked before ordering.

What is a Homestead Plan?

A Homestead Plan is a drawn site plan and a written build sequence for one piece of land: where the house, well, septic ground, garden, animals and power can go, the order to build them in from raw land, the materials with quantities, cost ranges, the permits and rules for your county, and a first-year calendar. A Homestead Plan is a site plan and a build sequence to plan with. It is not a set of stamped construction drawings, it is not engineering and it is not a survey.

What does a Homestead Plan cost?

The Starter Homestead Plan is $49. The Custom Homestead Plan is $297 for land of 20 acres or under and $497 for land over 20 acres. Each is one set price, paid in full when you order.

What if I do not own land yet?

The Starter Homestead Plan is for you. Name the city or county and the state where you want to be and the lot size you have in mind, and we make a plan for a typical lot of that size in that area. It is drawn for a typical lot, not for your parcel. When you have real land, the Custom Homestead Plan is the one drawn for it.

Is it a set of construction drawings, engineering or a survey?

No. It is a planning document. A septic system is designed and permitted through your county, a well is sited by your driller, property corners are found by a licensed surveyor, and anything structural is engineered and permitted where your county requires it. Cost figures are published ranges, not bids.

When do I get my plan?

We email your plan when it is ready. We do not quote a date on this page. If you have a deadline, send the form as a question first and tell us the date.

Can I ask a question before I pay?

Yes. Fill in what you know and choose "Send as a question, no payment". We read it ourselves and write back to your email.